Left click on images to enlargeThe original ceiling shoed signs of cracking and detachment of the lime plaster from the wood lath backingA section of the apex moulding had collapsed after complete failure of the lime rivets to the lathingA safety net had been installed to allow the church to continue safely until the replacement work could commence
|