Wm McVey Plasterers

Prestart

Album_Logo.jpg (8108 bytes)
Up

 

 

 

Back Next

Left click on images to enlarge

The original ceiling shoed signs of cracking and detachment of the lime plaster from the wood lath backing

A section of the apex moulding had collapsed after complete failure of the lime rivets to the lathing

     

A safety net had been installed to allow the church to continue safely until the replacement work could commence