Wm McVey Plasterers

Parlour Lath & Lime Plasterwork

Album_Logo.jpg (8108 bytes)
Up

 

 

 

Back

Parlour 1st coat.jpg (27105 bytes)

First coating the lath ceiling

Straightening the 1st Fl Lounge.jpg (41854 bytes)

Damping down prior to straightening the first coated lath walls

straightening the parlour.jpg (36570 bytes)

Devil floating the walls after straightening lime coat.

Finishing wall.jpg (45689 bytes)

Finishing the walls with lime