Wm McVey Plasterers

Sunken panel reinstatement

Album_Logo.jpg (8108 bytes)
Up

 

 

 

Back Next

 

The original enrichments were reused, these had to cleaned of loose paint and the  lime bedding removed prior to fixing.

The photograph with the fixing grid superimposed to allow the exact repositioning of the panel enrichments

 

           

Stages of fixing

                    

The original enrichments were cleaned and bedded in gauged putty lime mix onto the ceiling, which had been perforated to allow for mechanical fixing anchors. Wires were also embedded to provide extra support